Actuarial Risk Consultants LLC
Up ] Reserve Analysis ] Probability Study ] Cash Flow Analysis ] Loss Control Analysis ] Risk Management ]

 

 

Up
Reserve Analysis
Probability Study
Cash Flow Analysis
Loss Control Analysis
Risk Management

Reserve Analysis

A reserve analysis provides a professional opinion regarding the loss reserves required for unpaid claims incurred as of a specified date.

 

Probability Study

A loss projection and probability study provides actuarial estimates of ultimate loss costs and the potential variability inherent in those estimates. 

 

Cash Flow Analysis

This analysis projects the timing of the payouts of the required loss costs and the variability that may occur. 

 

Loss Control Analysis

After a loss control program has been implemented, this type of analysis measures its costs as compared to a benchmark cost.

 

Risk Management

Many risk management tasks benefit from an actuarial of the underlying loss costs.

 

 

 

Home ] Reserve Analysis ] Probability Study ] Cash Flow Analysis ] Loss Control Analysis ] Risk Management ]  

Send mail to webmaster@riskactuary.com with questions or comments about this web site.
Copyright © 2003 Actuarial Risk Consultants LLC